Sabine County, Louisiana — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Sabine, Louisiana, representing 2,274 MW of requested capacity.

12Total projects
1Active
6Operational
5Withdrawn
2,274 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar81,862 MW
Battery4412 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
HARTBURG - AEP LAYFIELD 500.0kVJ3408Solar450.0 MWwithdrawnSabine, Louisiana
HARTBURG - AEP LAYFIELD 500.0kVJ1890Solar270.0 MWoperationalSabine, Louisiana
FisherJ2180Solar250.0 MWoperationalSabine, Louisiana
Hollis Creek Solar69590_HC1Solar220.0 MWactiveSabine, Louisiana
Fisher - Many 138.0kVJ3612Solar200.0 MWwithdrawnSabine, Louisiana
Fisher - Marthaville 230.0kVJ1673Solar200.0 MWoperationalSabine, Louisiana
Fisher - Many 138.0kVJ3771Battery200.0 MWwithdrawnSabine, Louisiana
Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904J2737Solar180.0 MWoperationalSabine, Louisiana
HARTBURG - AEP LAYFIELD 500.0kVJ3585Battery150.0 MWwithdrawnSabine, Louisiana
1673 Interconnection SubstationJ2920Solar92.0 MWoperationalSabine, Louisiana
Fisher 230 kVJ2214Battery62.0 MWwithdrawnSabine, Louisiana
Fisher to Mansfield Compressor 230 kVJ1759Battery0.0 MWoperationalSabine, Louisiana

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Sabine County.