Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904 (J2737)
Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904 is a 180.0 MW solar interconnection project in Sabine, Louisiana with a current status of operational. It is proposed to connect at Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904.
Project facts
| Canonical name | Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904 |
|---|---|
| Queue ID | J2737 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Solar |
| Capacity | 180.0 MW |
| State | Louisiana |
| County | Sabine |
| Point of interconnection | Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904 |
| Requested (queue) date | 2025-09-05 |
| Proposed in-service date | 2026-09-30 |
| Operational date | 2026-09-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Cleco Power LLC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.