Sibley County, Minnesota — Interconnection Projects

The interXdata warehouse tracks 8 interconnection projects in Sibley, Minnesota, representing 86 MW of requested capacity.

8Total projects
0Active
5Operational
3Withdrawn
86 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind379 MW
Solar57 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project H064 — Wind in Sibley, MinnesotaH064Wind39.0 MWwithdrawnSibley, Minnesota
MISO Queue Project G357 — Wind in Sibley, MinnesotaG357Wind20.0 MWwithdrawnSibley, Minnesota
MISO Queue Project G587 — Wind in Sibley, MinnesotaG587Wind20.0 MWwithdrawnSibley, Minnesota
Gibbon Solar62010_PGRK1Solar3.3 MWoperationalSibley, Minnesota
Erin Garden Solar63429_CSGSolar1.0 MWoperationalSibley, Minnesota
SolarClub 28 LLC65453_SC 28Solar1.0 MWoperationalSibley, Minnesota
Mud Garden Solar63427_CGSSolar1.0 MWoperationalSibley, Minnesota
Titlow Garden LLC CSG66004_TTLOWSolar1.0 MWoperationalSibley, Minnesota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.