Stevens County, Minnesota — Interconnection Projects
The interXdata warehouse tracks 12 interconnection projects in Stevens, Minnesota, representing 1,309 MW of requested capacity.
12Total projects
0Active
5Operational
7Withdrawn
1,309 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 8 | 563 MW |
| Battery | 1 | 450 MW |
| Solar | 2 | 295 MW |
| Other | 1 | 1 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Big Stone South 345kV Substation | J2624 | Battery | 450.0 MW | withdrawn | Stevens, Minnesota |
| MISO Queue Project G805 — Wind in Stevens, Minnesota | G805 | Wind | 300.0 MW | withdrawn | Stevens, Minnesota |
| Hancock 115kV Substation | J2608 | Solar | 160.0 MW | operational | Stevens, Minnesota |
| Big Stone South - Alexandria 345.0kV | J3669 | Solar | 135.0 MW | operational | Stevens, Minnesota |
| MISO Queue Project G555 — Wind in Stevens, Minnesota | G555 | Wind | 100.0 MW | withdrawn | Stevens, Minnesota |
| MISO Queue Project G737 — Wind in Stevens, Minnesota | G737 | Wind | 100.0 MW | withdrawn | Stevens, Minnesota |
| MISO Queue Project G777 — Wind in Stevens, Minnesota | G777 | Wind | 20.0 MW | withdrawn | Stevens, Minnesota |
| MISO Queue Project G644 — Wind in Stevens, Minnesota | G644 | Wind | 20.0 MW | withdrawn | Stevens, Minnesota |
| MISO Queue Project G638 — Wind in Stevens, Minnesota | G638 | Wind | 20.0 MW | withdrawn | Stevens, Minnesota |
| WCROC Wind Farm | 57823_WTG1 | Wind | 1.7 MW | operational | Stevens, Minnesota |
| UMM Wind Turbine | 57732_UMM1 | Wind | 1.7 MW | operational | Stevens, Minnesota |
| Stevens Community Medical Center | 56245_1 | Other | 1.0 MW | operational | Stevens, Minnesota |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Stevens County.
Start tracking with interXdata