Scott County, Mississippi — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Scott, Mississippi, representing 884 MW of requested capacity.
6Total projects
0Active
2Operational
4Withdrawn
884 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 634 MW |
| Gas | 1 | 150 MW |
| Battery | 1 | 100 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| PELAHATCHIE | J3680 | Solar | 189.0 MW | withdrawn | Scott, Mississippi |
| Southeast Queue Project 431 — Solar in Scott, Mississippi | 431 | Solar | 175.0 MW | withdrawn | Scott, Mississippi |
| Pearl River Solar Park LLC | 66239_GEN01 | Solar | 175.0 MW | operational | Scott, Mississippi |
| Southeast Queue Project 230 — Gas in Scott, Mississippi | 230 | Gas | 150.0 MW | withdrawn | Scott, Mississippi |
| J1347 TO Switchyard (115kV Entergy MS Switchyard) | J4131 | Battery | 100.0 MW | operational | Scott, Mississippi |
| Homewood 69 - Lake 69.0kV | J3714 | Solar | 95.0 MW | withdrawn | Scott, Mississippi |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.