Joplin County, Missouri — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Joplin, Missouri, representing 404 MW of requested capacity.

5Total projects
1Active
3Operational
1Withdrawn
404 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas2320 MW
Other384 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
State Line 439 161 kV SubstationERAS-2025-034Gas250.0 MWoperationalJoplin, Missouri
GEN-2019-078GEN-2019-078Gas70.0 MWwithdrawnJoplin, Missouri
4544 Stateline CC 161kV SubstationGEN-2020-064Other64.0 MWactiveJoplin, Missouri
LaRussell Energy Center 161kVGEN-2016-014Other10.0 MWoperationalJoplin, Missouri
LaRussell Energy Center 161kVGEN-2016-013Other10.0 MWoperationalJoplin, Missouri

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.