Cedar County, Nebraska — Interconnection Projects
The interXdata warehouse tracks 8 interconnection projects in Cedar, Nebraska, representing 756 MW of requested capacity.
8Total projects
0Active
6Operational
2Withdrawn
756 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 620 MW |
| Other | 3 | 132 MW |
| Gas | 3 | 4 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| McCool 345kV Substation | GEN-2017-210 | Solar | 310.0 MW | withdrawn | Cedar, Nebraska |
| Mark T. Moore 345kV Substation | GEN-2017-212 | Solar | 310.0 MW | withdrawn | Cedar, Nebraska |
| Gavins Point | 6624_1 | Other | 44.1 MW | operational | Cedar, Nebraska |
| Gavins Point | 6624_3 | Other | 44.1 MW | operational | Cedar, Nebraska |
| Gavins Point | 6624_2 | Other | 44.1 MW | operational | Cedar, Nebraska |
| Laurel | 2249_1 | Gas | 1.3 MW | operational | Cedar, Nebraska |
| Laurel | 2249_7 | Gas | 1.3 MW | operational | Cedar, Nebraska |
| Laurel | 2249_2 | Gas | 0.9 MW | operational | Cedar, Nebraska |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Cedar County.
Start tracking with interXdata