The interXdata warehouse tracks 13 interconnection projects in Richardson, Nebraska, representing 247 MW of requested capacity.

13Total projects
0Active
10Operational
3Withdrawn
247 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Battery180 MW
Wind270 MW
Solar165 MW
Gas730 MW
Other22 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Humboldt 161 kV SubstationGEN-2022-152Battery80.0 MWwithdrawnRichardson, Nebraska
S1399 5 161 kV SubstationGEN-2024-231Solar65.0 MWwithdrawnRichardson, Nebraska
Flat Water Wind Farm LLC57283_WTG1Wind60.0 MWoperationalRichardson, Nebraska
S1399 161kVGEN-2010-041Wind10.3 MWwithdrawnRichardson, Nebraska
Falls City2237_9Gas9.3 MWoperationalRichardson, Nebraska
Falls City2237_7Gas6.2 MWoperationalRichardson, Nebraska
Falls City2237_8Gas6.0 MWoperationalRichardson, Nebraska
Falls City2237_3Gas2.7 MWoperationalRichardson, Nebraska
Falls City2237_6Gas2.5 MWoperationalRichardson, Nebraska
Falls City2237_5Gas2.0 MWoperationalRichardson, Nebraska
Falls City2237_4Gas1.1 MWoperationalRichardson, Nebraska
Falls City2237_2Other0.9 MWoperationalRichardson, Nebraska
Falls City2237_1Other0.6 MWoperationalRichardson, Nebraska

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.