Quay County, New Mexico — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Quay, New Mexico, representing 1,464 MW of requested capacity.

12Total projects
0Active
9Operational
3Withdrawn
1,464 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar4930 MW
Wind6506 MW
Other127 MW
Battery11 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Tucumcari - Norton 115 kV Line TapGEN-2023-095Solar850.0 MWwithdrawnQuay, New Mexico
New Mexico Wind Energy Center56097_GE15Wind204.0 MWoperationalQuay, New Mexico
Tucumcari - Norton 115 kV Line TapGEN-2023-096Wind150.0 MWwithdrawnQuay, New Mexico
Caprock Wind Farm56293_1Wind80.0 MWoperationalQuay, New Mexico
Casa Mesa Wind Energy Center Hybrid61925_CMNMWind50.9 MWoperationalQuay, New Mexico
Norton 115kVGEN-2014-066Solar30.0 MWwithdrawnQuay, New Mexico
Quay County58125_1Other27.0 MWoperationalQuay, New Mexico
Caprock Solar 1 LLC59251_PV1Solar25.0 MWoperationalQuay, New Mexico
Norton 115kV Switching StationGEN-2013-022Solar25.0 MWoperationalQuay, New Mexico
Caprock Wind Farm56293_2Wind20.0 MWoperationalQuay, New Mexico
Mesalands Comm College Wind Turbine57106_1Wind1.5 MWoperationalQuay, New Mexico
Casa Mesa Wind Energy Center Hybrid61925_CMNMBBattery1.0 MWoperationalQuay, New Mexico

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.