The interXdata warehouse tracks 10 interconnection projects in Chowan, North Carolina, representing 521 MW of requested capacity.

10Total projects
0Active
7Operational
3Withdrawn
521 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar6330 MW
Wind2189 MW
Other22 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Perquimans 230 kVAI1-135Solar300.0 MWwithdrawnChowan, North Carolina
Timbermill Wind, LLC67910_TIMBYWind189.0 MWoperationalChowan, North Carolina
Edenton 15kVAA2-059Solar10.0 MWwithdrawnChowan, North Carolina
Gliden (Op Zone)64385_304Solar5.0 MWoperationalChowan, North Carolina
Chowan Jehu Solar62693_PGR03Solar5.0 MWoperationalChowan, North Carolina
Edenton Solar61781_EDESolar5.0 MWoperationalChowan, North Carolina
Ryland Road Solar64677_RYLNDSolar5.0 MWoperationalChowan, North Carolina
Edenton Generators7429_2Other1.2 MWoperationalChowan, North Carolina
Edenton Generators7429_3Other1.2 MWoperationalChowan, North Carolina
WinFall-Chowan 230kVAI2-223Wind0.0 MWwithdrawnChowan, North Carolina

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.