Hyde County, North Carolina — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Hyde, North Carolina, representing 156 MW of requested capacity.

6Total projects
0Active
5Operational
1Withdrawn
156 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar276 MW
Wind174 MW
Battery24 MW
Other13 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Pantago-Five Points 115kVAB2-169Solar74.0 MWoperationalHyde, North Carolina
Pantego 115kVW2-022Wind73.6 MWwithdrawnHyde, North Carolina
Ocracoke Hybrid6377_1Other3.0 MWoperationalHyde, North Carolina
Rose Acre Solar Energy Storage64511_BAT1Battery2.5 MWoperationalHyde, North Carolina
Rose Acre Solar Energy Storage64511_SOL1Solar2.0 MWoperationalHyde, North Carolina
Ocracoke Hybrid6377_BATBattery1.0 MWoperationalHyde, North Carolina

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.