Hyde County, North Carolina — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Hyde, North Carolina, representing 156 MW of requested capacity.
6Total projects
0Active
5Operational
1Withdrawn
156 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 76 MW |
| Wind | 1 | 74 MW |
| Battery | 2 | 4 MW |
| Other | 1 | 3 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Pantago-Five Points 115kV | AB2-169 | Solar | 74.0 MW | operational | Hyde, North Carolina |
| Pantego 115kV | W2-022 | Wind | 73.6 MW | withdrawn | Hyde, North Carolina |
| Ocracoke Hybrid | 6377_1 | Other | 3.0 MW | operational | Hyde, North Carolina |
| Rose Acre Solar Energy Storage | 64511_BAT1 | Battery | 2.5 MW | operational | Hyde, North Carolina |
| Rose Acre Solar Energy Storage | 64511_SOL1 | Solar | 2.0 MW | operational | Hyde, North Carolina |
| Ocracoke Hybrid | 6377_BAT | Battery | 1.0 MW | operational | Hyde, North Carolina |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Hyde County.
Start tracking with interXdata