Wheeler County, Oregon — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Wheeler, Oregon, representing 400 MW of requested capacity.
3Total projects
0Active
0Operational
3Withdrawn
400 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 2 | 400 MW |
| Other | 1 | 0 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| OR Queue Project G0427 — Wind in Wheeler, Oregon | G0427 | Wind | 300.0 MW | withdrawn | Wheeler, Oregon |
| OR Queue Project G0422 — Wind in Wheeler, Oregon | G0422 | Wind | 100.0 MW | withdrawn | Wheeler, Oregon |
| Detroit Substation | L0400 | Other | 0.0 MW | withdrawn | Wheeler, Oregon |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| USACE Portland | 1 | 0 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Wheeler County.
Start tracking with interXdata