Lancaster County, South Carolina — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Lancaster, South Carolina, representing 208 MW of requested capacity.
7Total projects
0Active
4Operational
3Withdrawn
208 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 4 | 163 MW |
| Other | 3 | 45 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SC Queue Project 241 — Solar in Lancaster, South Carolina | 241 | Solar | 75.0 MW | withdrawn | Lancaster, South Carolina |
| SC Queue Project 175 — Solar in Lancaster, South Carolina | 175 | Solar | 75.0 MW | withdrawn | Lancaster, South Carolina |
| Cedar Creek (SC) | 3255_1 | Other | 15.0 MW | operational | Lancaster, South Carolina |
| Cedar Creek (SC) | 3255_3 | Other | 15.0 MW | operational | Lancaster, South Carolina |
| Cedar Creek (SC) | 3255_2 | Other | 15.0 MW | operational | Lancaster, South Carolina |
| Duke Energy Carolinas LLC | 009588 | Solar | 10.0 MW | withdrawn | Lancaster, South Carolina |
| Crown | 63635_CROWN | Solar | 3.0 MW | operational | Lancaster, South Carolina |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Duke Energy Florida, LLC | 1 | 10 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: duke-dec-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned); santee-cooper-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.