Potter County, South Dakota — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Potter, South Dakota, representing 342 MW of requested capacity.

3Total projects
0Active
0Operational
3Withdrawn
342 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2246 MW
Solar+Battery196 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
SPP Queue Project GEN-2020-093 — Solar in Potter, South DakotaGEN-2020-093Solar150.0 MWwithdrawnPotter, South Dakota
Whitlock 230 kV SubstationGEN-2023-130Solar96.0 MWwithdrawnPotter, South Dakota
SPP Queue Project GEN-2023-130 — Solar+Battery in Potter, South DakotaGEN-2023-130Solar+Battery96.0 MWwithdrawnPotter, South Dakota

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-01

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; spp-summary-csv. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Potter County.