Potter County, South Dakota — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Potter, South Dakota, representing 342 MW of requested capacity.
3Total projects
0Active
0Operational
3Withdrawn
342 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 246 MW |
| Solar+Battery | 1 | 96 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SPP Queue Project GEN-2020-093 — Solar in Potter, South Dakota | GEN-2020-093 | Solar | 150.0 MW | withdrawn | Potter, South Dakota |
| Whitlock 230 kV Substation | GEN-2023-130 | Solar | 96.0 MW | withdrawn | Potter, South Dakota |
| SPP Queue Project GEN-2023-130 — Solar+Battery in Potter, South Dakota | GEN-2023-130 | Solar+Battery | 96.0 MW | withdrawn | Potter, South Dakota |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-01
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; spp-summary-csv. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Potter County.
Start tracking with interXdata