Benton County, Tennessee — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Benton, Tennessee, representing 74 MW of requested capacity.

5Total projects
0Active
4Operational
1Withdrawn
74 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar269 MW
Gas35 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Southeast Queue Project 281 — Solar in Benton, Tennessee281Solar66.0 MWwithdrawnBenton, Tennessee
SR Benton68095_BENTNSolar3.0 MWoperationalBenton, Tennessee
West Camden57409_GEN3Gas1.6 MWoperationalBenton, Tennessee
West Camden57409_GEN1Gas1.6 MWoperationalBenton, Tennessee
West Camden57409_GEN2Gas1.6 MWoperationalBenton, Tennessee

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Benton County.

Start tracking with interXdata