Polk County, Tennessee — Interconnection Projects
The interXdata warehouse tracks 12 interconnection projects in Polk, Tennessee, representing 284 MW of requested capacity.
12Total projects
0Active
10Operational
2Withdrawn
284 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 10 | 164 MW |
| Solar+Battery | 1 | 100 MW |
| Battery | 1 | 20 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Southeast Queue Project 457 — Solar+Battery in Polk, Tennessee | 457 | Solar+Battery | 100.0 MW | withdrawn | Polk, Tennessee |
| Apalachia | 3394_1 | Other | 52.2 MW | operational | Polk, Tennessee |
| Apalachia | 3394_2 | Other | 41.4 MW | operational | Polk, Tennessee |
| Ocoee 3 | 3414_1 | Other | 28.8 MW | operational | Polk, Tennessee |
| Southeast Queue Project 271 — Battery in Polk, Tennessee | 271 | Battery | 20.0 MW | withdrawn | Polk, Tennessee |
| Ocoee 2 | 3413_2 | Other | 11.5 MW | operational | Polk, Tennessee |
| Ocoee 2 | 3413_1 | Other | 11.5 MW | operational | Polk, Tennessee |
| Ocoee 1 | 3412_2 | Other | 3.8 MW | operational | Polk, Tennessee |
| Ocoee 1 | 3412_4 | Other | 3.8 MW | operational | Polk, Tennessee |
| Ocoee 1 | 3412_1 | Other | 3.8 MW | operational | Polk, Tennessee |
| Ocoee 1 | 3412_3 | Other | 3.8 MW | operational | Polk, Tennessee |
| Ocoee 1 | 3412_5 | Other | 3.8 MW | operational | Polk, Tennessee |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Polk County.
Start tracking with interXdata