Cochran County, Texas — Interconnection Projects
The interXdata warehouse tracks 4 interconnection projects in Cochran, Texas, representing 569 MW of requested capacity.
4Total projects
1Active
1Operational
2Withdrawn
569 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 1 | 244 MW |
| Battery | 2 | 175 MW |
| Wind | 1 | 150 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Tolk – Yoakum 230 kV line | GEN-2022-227 | Solar | 244.0 MW | withdrawn | Cochran, Texas |
| Wildcat Ranch Wind Project | 61674_WT | Wind | 150.0 MW | operational | Cochran, Texas |
| Wildcat Ranch Energy Storage | 68877_WLDC1 | Battery | 120.0 MW | active | Cochran, Texas |
| Lehman 115 kV Tap | GEN-2022-027 | Battery | 55.0 MW | withdrawn | Cochran, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Cochran County.
Start tracking with interXdata