Cochran County, Texas — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Cochran, Texas, representing 569 MW of requested capacity.

4Total projects
1Active
1Operational
2Withdrawn
569 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar1244 MW
Battery2175 MW
Wind1150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Tolk – Yoakum 230 kV lineGEN-2022-227Solar244.0 MWwithdrawnCochran, Texas
Wildcat Ranch Wind Project61674_WTWind150.0 MWoperationalCochran, Texas
Wildcat Ranch Energy Storage68877_WLDC1Battery120.0 MWactiveCochran, Texas
Lehman 115 kV TapGEN-2022-027Battery55.0 MWwithdrawnCochran, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Cochran County.

Start tracking with interXdata