Hockley County, Texas — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Hockley, Texas, representing 1,104 MW of requested capacity.

6Total projects
0Active
0Operational
6Withdrawn
1,104 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind4654 MW
Solar2450 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Tuco-Yoakum-Hobbs 345kVGEN-2021-089Solar400.0 MWwithdrawnHockley, Texas
Tuco to Yoakum 345kV lineGEN-2020-066Wind253.8 MWwithdrawnHockley, Texas
Carlisle 230kVGEN-2016-056Wind200.0 MWwithdrawnHockley, Texas
Carlisle 230kVGEN-2014-054Wind120.0 MWwithdrawnHockley, Texas
Carlisle 230kVGEN-2014-053Wind80.0 MWwithdrawnHockley, Texas
Clauene 115kV; (Alt. POI) Tap Clauene - Terry County 115kVGEN-2014-042Solar50.0 MWwithdrawnHockley, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Hockley County.

Start tracking with interXdata