Madison County, Texas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Madison, Texas, representing 1,474 MW of requested capacity.
6Total projects
2Active
4Operational
0Withdrawn
1,474 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 661 MW |
| Other | 3 | 613 MW |
| Battery | 1 | 200 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Hollow Branch Creek | 65851_HB2PV | Solar | 460.0 MW | active | Madison, Texas |
| Masava Storage | 25INR0176 | Other | 257.0 MW | operational | Madison, Texas |
| Tex-Bar ESS | 26INR0411 | Other | 201.5 MW | operational | Madison, Texas |
| Savannah Oaks Solar | 25INR0286 | Solar | 201.2 MW | operational | Madison, Texas |
| Tex-Bar ESS | 68364_TBESS | Battery | 200.0 MW | active | Madison, Texas |
| SOSA Storage | 25INR0131 | Other | 154.6 MW | operational | Madison, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Savannah Oaks Solar Project, LLC | 2 | 458 MW |
| Tex-Bar ESS LLC | 1 | 202 MW |
| Sosa Energy Center, LLC | 1 | 155 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Madison County.
Start tracking with interXdata