Menard County, Texas — Interconnection Projects

The interXdata warehouse tracks 5 interconnection projects in Menard, Texas, representing 664 MW of requested capacity.

5Total projects
1Active
3Operational
1Withdrawn
664 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind1300 MW
Other1204 MW
Solar3160 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Fort McKavett Wind20INR0154Wind300.0 MWwithdrawnMenard, Texas
Black & Gold Energy Storage24INR0386Other203.8 MWoperationalMenard, Texas
Callan Solar27INR0241Solar91.0 MWoperationalMenard, Texas
Centennial Solar26INR0372Solar61.4 MWactiveMenard, Texas
Lampwick61872_GEN1Solar7.5 MWoperationalMenard, Texas

Top developers

Developer (canonical)ProjectsCapacity
Nextera1300 MW
Centennial AD 8 LLC161 MW
Menard PV, LLC191 MW
Black & Gold Energy Storage, LLC1204 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Menard County.

Start tracking with interXdata