Moore County, Texas — Interconnection Projects
The interXdata warehouse tracks 7 interconnection projects in Moore, Texas, representing 163 MW of requested capacity.
7Total projects
0Active
6Operational
1Withdrawn
163 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 6 | 98 MW |
| Solar | 1 | 65 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Dumas and 19th Street 115 kV Substation | GEN-2023-109 | Solar | 65.0 MW | withdrawn | Moore, Texas |
| Sunray Wind I | 57326_WND1 | Wind | 49.5 MW | operational | Moore, Texas |
| Flat Iron Wind (7) LLC | 56839_1 | Wind | 10.0 MW | operational | Moore, Texas |
| Ribeye Wind (11) LLC | 56835_1 | Wind | 10.0 MW | operational | Moore, Texas |
| Brisket Wind (8) LLC | 56838_1 | Wind | 10.0 MW | operational | Moore, Texas |
| Tri-Tip Wind (9) LLC | 56837_1 | Wind | 10.0 MW | operational | Moore, Texas |
| T-Bone Wind (10) LLC | 56836_1 | Wind | 8.8 MW | operational | Moore, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.