Oldham County, Texas — Interconnection Projects
The interXdata warehouse tracks 15 interconnection projects in Oldham, Texas, representing 3,326 MW of requested capacity.
15Total projects
0Active
6Operational
8Withdrawn
3,326 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 15 | 3,326 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Channing Wind | 28INR0018 | Wind | 360.5 MW | suspended | Oldham, Texas |
| Potter 345kV Substation | GEN-2022-116 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Potter 345kV Substation | GEN-2022-122 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Potter 345kV Substation | GEN-2022-118 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Channing 230kV Substation | GEN-2022-127 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Potter 345kV Substation | GEN-2022-121 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Potter 345kV Substation | GEN-2022-119 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Potter 345kV Substation | GEN-2022-120 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Potter 345kV Substation | GEN-2022-117 | Wind | 250.0 MW | withdrawn | Oldham, Texas |
| Canadian Breaks Wind | 13INR0026 | Wind | 210.0 MW | operational | Oldham, Texas |
| Spinning Spur Wind III | 58775_GEN1 | Wind | 194.0 MW | operational | Oldham, Texas |
| Wildorado Wind LLC | 56432_1 | Wind | 161.0 MW | operational | Oldham, Texas |
| Spinning Spur Wind II | 58774_GEN1 | Wind | 161.0 MW | operational | Oldham, Texas |
| Spinning Spur Wind LLC | 57973_GEN1 | Wind | 161.0 MW | operational | Oldham, Texas |
| Golden Spread Panhandle Wnd Rch | 57866_PWR | Wind | 78.2 MW | operational | Oldham, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Macquarie Cap | 1 | 210 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Oldham County.
Start tracking with interXdata