Orange County, Texas — Interconnection Projects
The interXdata warehouse tracks 16 interconnection projects in Orange, Texas, representing 4,677 MW of requested capacity.
16Total projects
3Active
10Operational
2Withdrawn
4,677 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 12 | 3,779 MW |
| Solar | 2 | 700 MW |
| Battery | 1 | 150 MW |
| Other | 1 | 48 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Sabine | 3459_4 | Gas | 591.6 MW | operational | Orange, Texas |
| Sabine | 3459_5 | Gas | 507.4 MW | operational | Orange, Texas |
| Sabine | 3459_3 | Gas | 473.4 MW | operational | Orange, Texas |
| Orange County Advanced Power Station | 66621_1B | Gas | 453.0 MW | active | Orange, Texas |
| Orange County Advanced Power Station | 66621_1A | Gas | 453.0 MW | active | Orange, Texas |
| Orange County Advanced Power Station | 66621_1C | Gas | 400.0 MW | active | Orange, Texas |
| CHISHOLM RD - SABINE 230 kV | J2953 | Solar | 400.0 MW | withdrawn | Orange, Texas |
| Chisholm RD- Hartburg 230kV | J3045 | Solar | 300.0 MW | operational | Orange, Texas |
| Sabine | 3459_1 | Gas | 239.4 MW | operational | Orange, Texas |
| Sabine River Operations | 10789_GT1B | Gas | 180.0 MW | operational | Orange, Texas |
| Sabine River Operations | 10789_GT1A | Gas | 180.0 MW | operational | Orange, Texas |
| Chisholm RD- Hartburg 230kV | J3123 | Battery | 150.0 MW | withdrawn | Orange, Texas |
| Sabine River Operations | 10789_ST1A | Gas | 145.0 MW | operational | Orange, Texas |
| Sabine River Operations | 10789_GEN1 | Gas | 89.9 MW | operational | Orange, Texas |
| Sabine 138/230 kV Substation | J1834 | Gas | 66.7 MW | operational | Orange, Texas |
| USG Paper, LLC - Orange Mill | 10425_TG | Other | 48.0 MW | suspended | Orange, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Orange County.
Start tracking with interXdata