Parmer County, Texas — Interconnection Projects

The interXdata warehouse tracks 11 interconnection projects in Parmer, Texas, representing 2,633 MW of requested capacity.

11Total projects
2Active
1Operational
7Withdrawn
2,633 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind72,073 MW
Solar3485 MW
Battery175 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Scandia Wind DEF13INR0010defWind600.3 MWwithdrawnParmer, Texas
Tolk 230kV SubstationGEN-2018-099Wind300.0 MWactiveParmer, Texas
Deaf Smith - Plant X 230 kV Line BreakGEN-2022-217Wind275.0 MWwithdrawnParmer, Texas
Lazbuddie Wind Energy LLC69478_LZBDEWind265.0 MWactiveParmer, Texas
Deaf Smith 230 kVGEN-2016-099Wind250.0 MWwithdrawnParmer, Texas
Mariah del Norte59005_MAR1Wind230.4 MWoperationalParmer, Texas
Tolk 230kV substationGEN-2018-124Solar200.0 MWwithdrawnParmer, Texas
Tolk 230kV substationGEN-2018-112Solar185.0 MWwithdrawnParmer, Texas
Mariah Del Este Wind13INR0010aWind152.5 MWsuspendedParmer, Texas
Tolk 230kV SubstationGEN-2018-097Solar100.0 MWwithdrawnParmer, Texas
Tolk 230kV substationGEN-2018-111Battery75.0 MWwithdrawnParmer, Texas

Top developers

Developer (canonical)ProjectsCapacity
Scandia Wind LLC1600 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Parmer County.

Start tracking with interXdata