Rains County, Texas — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Rains, Texas, representing 680 MW of requested capacity.
5Total projects
2Active
2Operational
1Withdrawn
680 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 2 | 253 MW |
| Solar | 2 | 251 MW |
| Battery | 1 | 176 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Willis Storage | 25INR0370 | Other | 176.1 MW | operational | Rains, Texas |
| Willis Storage | 68176_WILBA | Battery | 176.1 MW | active | Rains, Texas |
| Barrett Solar | 24INR0477 | Solar | 125.8 MW | active | Rains, Texas |
| Barrett Solar Project | 69359_BARS1 | Solar | 125.0 MW | operational | Rains, Texas |
| Barrett Storage | 24INR0478 | Other | 76.5 MW | withdrawn | Rains, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Barrett Solar Project, LLC | 1 | 126 MW |
| BT Barrett Solar, LLC | 1 | 76 MW |
| Majewski Storage LLC | 1 | 176 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report; Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Rains County.
Start tracking with interXdata