Real County, Texas — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Real, Texas, representing 21 MW of requested capacity.

3Total projects
2Active
1Operational
0Withdrawn
21 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Other110 MW
Battery110 MW
Solar12 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Leakey BESS23INR0548Other9.9 MWactiveReal, Texas
Regis Leakey69338_LEAKYBattery9.9 MWactiveReal, Texas
Bandera Electric Coop PV61205_PV1Solar1.5 MWoperationalReal, Texas

Top developers

Developer (canonical)ProjectsCapacity
Regis Leaky LLC110 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Real County.

Start tracking with interXdata