Real County, Texas — Interconnection Projects
The interXdata warehouse tracks 3 interconnection projects in Real, Texas, representing 21 MW of requested capacity.
3Total projects
2Active
1Operational
0Withdrawn
21 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Other | 1 | 10 MW |
| Battery | 1 | 10 MW |
| Solar | 1 | 2 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Leakey BESS | 23INR0548 | Other | 9.9 MW | active | Real, Texas |
| Regis Leakey | 69338_LEAKY | Battery | 9.9 MW | active | Real, Texas |
| Bandera Electric Coop PV | 61205_PV1 | Solar | 1.5 MW | operational | Real, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Regis Leaky LLC | 1 | 10 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Real County.