Shackelford County, Texas — Interconnection Projects

The interXdata warehouse tracks 6 interconnection projects in Shackelford, Texas, representing 1,283 MW of requested capacity.

6Total projects
0Active
5Operational
0Withdrawn
1,283 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind3566 MW
Battery1307 MW
Other1206 MW
Solar1204 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Haute Stockage26INR0282Battery307.3 MWsuspendedShackelford, Texas
Shackleford BESS26INR0500Other206.5 MWoperationalShackelford, Texas
Chimney Creek Solar28INR0151Solar203.9 MWoperationalShackelford, Texas
Post Oak Wind LLC56483_1Wind200.0 MWoperationalShackelford, Texas
Mesquite Wind Power LLC56395_1Wind200.0 MWoperationalShackelford, Texas
Hackberry Wind Farm56823_HWFG1Wind165.6 MWoperationalShackelford, Texas

Top developers

Developer (canonical)ProjectsCapacity
Shackelford County BESS LLC1206 MW
Chimney Creek Energy, LLC1204 MW

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.