Shackelford County, Texas — Interconnection Projects
The interXdata warehouse tracks 6 interconnection projects in Shackelford, Texas, representing 1,283 MW of requested capacity.
6Total projects
0Active
5Operational
0Withdrawn
1,283 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 3 | 566 MW |
| Battery | 1 | 307 MW |
| Other | 1 | 206 MW |
| Solar | 1 | 204 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Haute Stockage | 26INR0282 | Battery | 307.3 MW | suspended | Shackelford, Texas |
| Shackleford BESS | 26INR0500 | Other | 206.5 MW | operational | Shackelford, Texas |
| Chimney Creek Solar | 28INR0151 | Solar | 203.9 MW | operational | Shackelford, Texas |
| Post Oak Wind LLC | 56483_1 | Wind | 200.0 MW | operational | Shackelford, Texas |
| Mesquite Wind Power LLC | 56395_1 | Wind | 200.0 MW | operational | Shackelford, Texas |
| Hackberry Wind Farm | 56823_HWFG1 | Wind | 165.6 MW | operational | Shackelford, Texas |
Top developers
| Developer (canonical) | Projects | Capacity |
|---|---|---|
| Shackelford County BESS LLC | 1 | 206 MW |
| Chimney Creek Energy, LLC | 1 | 204 MW |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Shackelford County.
Start tracking with interXdata