Sherman County, Texas — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Sherman, Texas, representing 500 MW of requested capacity.

4Total projects
0Active
2Operational
2Withdrawn
500 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind4500 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Moore Co 230 kV SubstationGEN-2023-010Wind280.0 MWwithdrawnSherman, Texas
Hitchland - Moore County (North Plains) 230 kvGEN-2013-001Wind200.0 MWwithdrawnSherman, Texas
Filet Wind (5) LLC56561_JDW5Wind10.0 MWoperationalSherman, Texas
Tenderloin Wind (6) LLC56562_JDW6Wind10.0 MWoperationalSherman, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Sherman County.

Start tracking with interXdata