Trinity County, Texas — Interconnection Projects

The interXdata warehouse tracks 4 interconnection projects in Trinity, Texas, representing 600 MW of requested capacity.

4Total projects
1Active
2Operational
1Withdrawn
600 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar3450 MW
Battery1150 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
ONALASKAJ3455Solar250.0 MWwithdrawnTrinity, Texas
ONALASKAJ4103Battery150.0 MWoperationalTrinity, Texas
MAGNOLIA GROVETON - KICKAPOO (L-111) TAP 138.0kVJ4124Solar100.0 MWoperationalTrinity, Texas
Triune Solar69639_16777Solar100.0 MWactiveTrinity, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Trinity County.

Start tracking with interXdata