Walker County, Texas — Interconnection Projects
The interXdata warehouse tracks 5 interconnection projects in Walker, Texas, representing 975 MW of requested capacity.
5Total projects
1Active
1Operational
3Withdrawn
975 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 5 | 975 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| ROCKY CREEK | J3768 | Solar | 250.0 MW | withdrawn | Walker, Texas |
| Rocky Creek | J2851 | Solar | 250.0 MW | withdrawn | Walker, Texas |
| RIVTRIN | J3821 | Solar | 175.0 MW | withdrawn | Walker, Texas |
| Piney Woods Solar | 67995_PWS | Solar | 150.0 MW | active | Walker, Texas |
| Rocky Creek to Lewis Creek 230kV | J1671 | Solar | 150.0 MW | operational | Walker, Texas |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Walker County.
Start tracking with interXdata