Washington County, Texas — Interconnection Projects

The interXdata warehouse tracks 3 interconnection projects in Washington, Texas, representing 329 MW of requested capacity.

3Total projects
1Active
0Operational
2Withdrawn
329 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Battery1209 MW
Solar2120 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Starlit Pasture Storage28INR0095Battery208.8 MWwithdrawnWashington, Texas
Lampe Solar24INR0101Solar60.2 MWwithdrawnWashington, Texas
Lampe Solar67781_GRS7Solar60.2 MWactiveWashington, Texas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Washington County.

Start tracking with interXdata