Rusk County, Wisconsin — Interconnection Projects
The interXdata warehouse tracks 17 interconnection projects in Rusk, Wisconsin, representing 452 MW of requested capacity.
17Total projects
0Active
17Operational
0Withdrawn
452 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 2 | 418 MW |
| Other | 11 | 32 MW |
| Gas | 4 | 3 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Stone Lake - Gardner Park 345.0kV | J3975 | Solar | 416.5 MW | operational | Rusk, Wisconsin |
| Flambeau Hydroelectric Station | 4142_1 | Other | 6.4 MW | operational | Rusk, Wisconsin |
| Flambeau Hydroelectric Station | 4142_3 | Other | 6.4 MW | operational | Rusk, Wisconsin |
| Flambeau Hydroelectric Station | 4142_2 | Other | 6.3 MW | operational | Rusk, Wisconsin |
| Big Falls | 3983_1 | Other | 2.6 MW | operational | Rusk, Wisconsin |
| Big Falls | 3983_2 | Other | 2.6 MW | operational | Rusk, Wisconsin |
| Big Falls | 3983_3 | Other | 2.5 MW | operational | Rusk, Wisconsin |
| Ladysmith Dam | 3986_3 | Other | 1.6 MW | operational | Rusk, Wisconsin |
| Conrath DPC Solar | 60889_PV1 | Solar | 1.0 MW | operational | Rusk, Wisconsin |
| Ladysmith Dam | 3986_1 | Other | 0.9 MW | operational | Rusk, Wisconsin |
| Ladysmith Dam | 3986_2 | Other | 0.9 MW | operational | Rusk, Wisconsin |
| Timberline Trail Gas Recovery | 56525_GEN4 | Gas | 0.8 MW | operational | Rusk, Wisconsin |
| Timberline Trail Gas Recovery | 56525_GEN2 | Gas | 0.8 MW | operational | Rusk, Wisconsin |
| Timberline Trail Gas Recovery | 56525_GEN5 | Gas | 0.8 MW | operational | Rusk, Wisconsin |
| Timberline Trail Gas Recovery | 56525_GEN3 | Gas | 0.8 MW | operational | Rusk, Wisconsin |
| Thornapple | 3988_2 | Other | 0.7 MW | operational | Rusk, Wisconsin |
| Thornapple | 3988_1 | Other | 0.7 MW | operational | Rusk, Wisconsin |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.