Rusk County, Wisconsin — Interconnection Projects

The interXdata warehouse tracks 17 interconnection projects in Rusk, Wisconsin, representing 452 MW of requested capacity.

17Total projects
0Active
17Operational
0Withdrawn
452 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Solar2418 MW
Other1132 MW
Gas43 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Stone Lake - Gardner Park 345.0kVJ3975Solar416.5 MWoperationalRusk, Wisconsin
Flambeau Hydroelectric Station4142_1Other6.4 MWoperationalRusk, Wisconsin
Flambeau Hydroelectric Station4142_3Other6.4 MWoperationalRusk, Wisconsin
Flambeau Hydroelectric Station4142_2Other6.3 MWoperationalRusk, Wisconsin
Big Falls3983_1Other2.6 MWoperationalRusk, Wisconsin
Big Falls3983_2Other2.6 MWoperationalRusk, Wisconsin
Big Falls3983_3Other2.5 MWoperationalRusk, Wisconsin
Ladysmith Dam3986_3Other1.6 MWoperationalRusk, Wisconsin
Conrath DPC Solar60889_PV1Solar1.0 MWoperationalRusk, Wisconsin
Ladysmith Dam3986_1Other0.9 MWoperationalRusk, Wisconsin
Ladysmith Dam3986_2Other0.9 MWoperationalRusk, Wisconsin
Timberline Trail Gas Recovery56525_GEN4Gas0.8 MWoperationalRusk, Wisconsin
Timberline Trail Gas Recovery56525_GEN2Gas0.8 MWoperationalRusk, Wisconsin
Timberline Trail Gas Recovery56525_GEN5Gas0.8 MWoperationalRusk, Wisconsin
Timberline Trail Gas Recovery56525_GEN3Gas0.8 MWoperationalRusk, Wisconsin
Thornapple3988_2Other0.7 MWoperationalRusk, Wisconsin
Thornapple3988_1Other0.7 MWoperationalRusk, Wisconsin

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Rusk County.

Start tracking with interXdata