Arizona Electric Pwr Coop Inc — Interconnection Queue Projects
Arizona Electric Pwr Coop Inc is associated with 20 tracked interconnection projects representing 1,072 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 12 | 820 MW |
| Other | 1 | 204 MW |
| Battery | 4 | 24 MW |
| Solar | 3 | 23 MW |
Geographic footprint
| State | Projects |
|---|---|
| Arizona | 16 |
| California | 4 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Apache Station | 160_ST3 | Other | 204.0 MW | operational | Cochise, Arizona |
| Apache Station | 160_ST2 | Gas | 204.0 MW | operational | Cochise, Arizona |
| Apache Station | 160_ST1 | Gas | 81.6 MW | operational | Cochise, Arizona |
| Apache Station | 160_GT3 | Gas | 78.7 MW | operational | Cochise, Arizona |
| Apache Station | 160_GT5 | Gas | 60.5 MW | operational | Cochise, Arizona |
| Mohave Energy Park | 69773_GT3 | Gas | 60.5 MW | active | Mohave, Arizona |
| Mohave Energy Park | 69773_GT2 | Gas | 60.5 MW | active | Mohave, Arizona |
| Mohave Energy Park | 69773_GT1 | Gas | 60.5 MW | active | Mohave, Arizona |
| Apache Station | 160_GT6 | Gas | 60.5 MW | operational | Cochise, Arizona |
| Mohave Energy Park | 69773_GT4 | Gas | 60.5 MW | active | Mohave, Arizona |
| Apache Station | 160_GT4 | Gas | 60.5 MW | operational | Cochise, Arizona |
| Apache Station | 160_GT2 | Gas | 20.4 MW | operational | Cochise, Arizona |
| Apache Solar I | 60964_AEPS1 | Solar | 20.0 MW | operational | Cochise, Arizona |
| Apache Station | 160_GT1 | Gas | 11.5 MW | operational | Cochise, Arizona |
| Apache Solar I | 60964_TRIB1 | Battery | 10.0 MW | operational | Cochise, Arizona |
| Apache Solar I | 60964_AEPB1 | Battery | 10.0 MW | operational | Cochise, Arizona |
| SunAnza | 60791_BA3 | Battery | 2.4 MW | operational | Riverside, California |
| SunAnza | 60791_ANZA1 | Solar | 2.0 MW | operational | Riverside, California |
| SunAnza | 60791_BA1&2 | Battery | 2.0 MW | operational | Riverside, California |
| SunAnza | 60791_ANZA2 | Solar | 1.4 MW | operational | Riverside, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Arizona Electric Pwr Coop Inc.
Start tracking with interXdata