Arlington Energy Center II is associated with 5 tracked interconnection projects representing 606 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 364 MW |
| Battery | 2 | 242 MW |
Geographic footprint
| State | Projects |
|---|---|
| California | 5 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Arlington Energy Center II | 64481_AEC2 | Solar | 133.0 MW | operational | Riverside, California |
| Arlington Energy Center II | 64481_AEC2B | Battery | 132.0 MW | operational | Riverside, California |
| Arlington Energy Center III | 64564_AEC3 | Solar | 131.0 MW | operational | Riverside, California |
| Arlington Energy Center III | 64564_AEC3B | Battery | 110.0 MW | operational | Riverside, California |
| Arlington Energy Center II | 64481_AEC1 | Solar | 100.0 MW | operational | Riverside, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Arlington Energy Center II.
Start tracking with interXdata