Bollinger Canyon Road BR 1-X Solar Project 2020 — Interconnection Queue Projects

Bollinger Canyon Road BR 1-X Solar Project 2020 is associated with 3 tracked interconnection projects representing 1 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

3Projects
0Active
3Operational
0Withdrawn
1 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar21 MW
Battery10 MW

Geographic footprint

StateProjects
California3

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Bishop Ranch BR 1-X67743_4057CSolar0.6 MWoperationalContra Costa, California
Bishop Ranch BR 1-X67743_4057BBattery0.5 MWoperationalContra Costa, California
Bishop Ranch BR 1-X67743_4057RSolar0.3 MWoperationalContra Costa, California

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Bollinger Canyon Road BR 1-X Solar Project 2020.

Start tracking with interXdata