Brazos Valley Energy — Interconnection Queue Projects
Brazos Valley Energy is associated with 3 tracked interconnection projects representing 676 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
3Projects
0Active
3Operational
0Withdrawn
676 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 3 | 676 MW |
Portfolio by market
| Market | Projects |
|---|---|
| MISO | 3 |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 3 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Jack Fusco Energy Center | 55357_STG1 | Gas | 275.6 MW | operational | Fort Bend, Texas |
| Jack Fusco Energy Center | 55357_CTG2 | Gas | 200.0 MW | operational | Fort Bend, Texas |
| Jack Fusco Energy Center | 55357_CTG1 | Gas | 200.0 MW | operational | Fort Bend, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Brazos Valley Energy.