Bright Canyon Energy — Interconnection Queue Projects

Bright Canyon Energy is associated with 4 tracked interconnection projects representing 40 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

4Projects
0Active
4Operational
0Withdrawn
40 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar220 MW
Battery220 MW

Geographic footprint

StateProjects
California4

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
BCE Los Alamitos 266532_BCE21Solar10.0 MWoperationalOrange, California
BCE Los Alamitos 166533_BCE11Solar10.0 MWoperationalOrange, California
BCE Los Alamitos 166533_BCE12Battery10.0 MWoperationalOrange, California
BCE Los Alamitos 266532_BCE22Battery10.0 MWoperationalOrange, California

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Bright Canyon Energy.

Start tracking with interXdata