Brownsville Public Utilities Board — Interconnection Queue Projects
Brownsville Public Utilities Board is associated with 8 tracked interconnection projects representing 142 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
8Projects
0Active
8Operational
0Withdrawn
142 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 3 | 136 MW |
| Other | 5 | 6 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 8 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Silas Ray | 3559_10 | Gas | 61.0 MW | operational | Cameron, Texas |
| Silas Ray | 3559_9 | Gas | 50.0 MW | operational | Cameron, Texas |
| Silas Ray | 3559_6 | Gas | 25.0 MW | operational | Cameron, Texas |
| Silas Ray | 3559_DG-6a | Other | 1.3 MW | operational | Cameron, Texas |
| Silas Ray | 3559_DG-4 | Other | 1.3 MW | operational | Cameron, Texas |
| Silas Ray | 3559_DG-3b | Other | 1.3 MW | operational | Cameron, Texas |
| Silas Ray | 3559_DG-6b | Other | 1.3 MW | operational | Cameron, Texas |
| Silas Ray | 3559_DG-3a | Other | 1.3 MW | operational | Cameron, Texas |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Brownsville Public Utilities Board.
Start tracking with interXdata