City of Breese - (IL) — Interconnection Queue Projects

City of Breese - (IL) is associated with 7 tracked interconnection projects representing 17 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

7Projects
0Active
7Operational
0Withdrawn
17 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other717 MW

Portfolio by market

MarketProjects
MISO7

Geographic footprint

StateProjects
Illinois7

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Breese934_IC3Other3.0 MWoperationalClinton, Illinois
Breese934_2Other3.0 MWoperationalClinton, Illinois
Breese934_5Other2.5 MWoperationalClinton, Illinois
Breese934_7Other2.5 MWoperationalClinton, Illinois
Breese934_6Other2.5 MWoperationalClinton, Illinois
Breese934_8Other2.5 MWoperationalClinton, Illinois
Breese934_IC1Other0.9 MWoperationalClinton, Illinois

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through City of Breese - (IL).

Start tracking with interXdata