City of Homestead - (FL) — Interconnection Queue Projects

City of Homestead - (FL) is associated with 11 tracked interconnection projects representing 36 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

11Projects
0Active
11Operational
0Withdrawn
36 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas934 MW
Other22 MW

Geographic footprint

StateProjects
Florida11

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
G W Ivey665_19Gas8.8 MWoperationalMiami Dade, Florida
G W Ivey665_21Gas6.4 MWoperationalMiami Dade, Florida
G W Ivey665_20Gas6.4 MWoperationalMiami Dade, Florida
G W Ivey665_13Gas2.0 MWoperationalMiami Dade, Florida
G W Ivey665_2Gas2.0 MWoperationalMiami Dade, Florida
G W Ivey665_14Gas2.0 MWoperationalMiami Dade, Florida
G W Ivey665_3Other2.0 MWoperationalMiami Dade, Florida
G W Ivey665_15Gas2.0 MWoperationalMiami Dade, Florida
G W Ivey665_17Gas2.0 MWoperationalMiami Dade, Florida
G W Ivey665_16Gas2.0 MWoperationalMiami Dade, Florida
G W Ivey665_22Other0.1 MWoperationalMiami Dade, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.