City of Tampa (FL) — Interconnection Queue Projects

City of Tampa (FL) is associated with 1 tracked interconnection projects representing 22 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

1Projects
0Active
1Operational
0Withdrawn
22 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Other122 MW

Geographic footprint

StateProjects
Florida1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
McKay Bay Facility50875_GEN1Other22.1 MWoperationalHillsborough, Florida

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through City of Tampa (FL).

Start tracking with interXdata