Costco Wholesale — Interconnection Queue Projects

Costco Wholesale is associated with 4 tracked interconnection projects representing 6 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

4Projects
0Active
4Operational
0Withdrawn
6 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar33 MW
Gas13 MW

Geographic footprint

StateProjects
California4

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Tracy 21063638_CTC13Gas2.6 MWoperationalSan Joaquin, California
Mira Loma58698_D9611Solar1.5 MWoperationalRiverside, California
Mira Loma58698_D960Solar1.0 MWoperationalRiverside, California
Mira Loma58698_D9612Solar0.5 MWoperationalRiverside, California

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Costco Wholesale.

Start tracking with interXdata