Deer Park Energy Center — Interconnection Queue Projects

Deer Park Energy Center is associated with 6 tracked interconnection projects representing 1,176 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

6Projects
0Active
6Operational
0Withdrawn
1,176 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Gas61,176 MW

Geographic footprint

StateProjects
Texas6

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Deer Park Energy Center55464_STG1Gas276.0 MWoperationalHarris, Texas
Deer Park Energy Center55464_CTG2Gas180.0 MWoperationalHarris, Texas
Deer Park Energy Center55464_CTG1Gas180.0 MWoperationalHarris, Texas
Deer Park Energy Center55464_CTG3Gas180.0 MWoperationalHarris, Texas
Deer Park Energy Center55464_CTG6Gas180.0 MWoperationalHarris, Texas
Deer Park Energy Center55464_CTG4Gas180.0 MWoperationalHarris, Texas

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through Deer Park Energy Center.

Start tracking with interXdata