EDPR CA Solar Park II LLC — Interconnection Queue Projects
EDPR CA Solar Park II LLC is associated with 5 tracked interconnection projects representing 636 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 3 | 501 MW |
| Battery | 2 | 135 MW |
Geographic footprint
| State | Projects |
|---|---|
| California | 5 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| EDPR CA Solar Park VI LLC (CA) Hybrid | 62892_SONRI | Solar | 201.0 MW | active | Fresno, California |
| Sandrini Solar 200 | 65663_GEN01 | Solar | 200.0 MW | operational | Kern, California |
| Sandrini Solar 100 | 65664_GEN02 | Solar | 100.0 MW | operational | Kern, California |
| Sandrini Solar 100 | 65664_GENBA | Battery | 95.4 MW | operational | Kern, California |
| EDPR CA Solar Park VI LLC (CA) Hybrid | 62892_SONR2 | Battery | 40.0 MW | active | Fresno, California |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through EDPR CA Solar Park II LLC.
Start tracking with interXdata