EMDE — Interconnection Queue Projects
EMDE is associated with 4 tracked interconnection projects representing 817 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
4Projects
0Active
1Operational
3Withdrawn
817 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 1 | 250 MW |
| Wind | 1 | 200 MW |
| Solar | 1 | 200 MW |
| Battery | 1 | 167 MW |
Geographic footprint
| State | Projects |
|---|---|
| Missouri | 4 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| State Line 439 161 kV Substation | ERAS-2025-034 | Gas | 250.0 MW | operational | Joplin, Missouri |
| Flint Creek - Brookline 345 kV line | GEN-2024-037 | Wind | 200.0 MW | withdrawn | Newton, Missouri |
| Asbury 161 kV Substation | GEN-2024-259 | Solar | 199.8 MW | withdrawn | Barton, Missouri |
| Reeds Spring - Aurora 161 kV Line | GEN-2024-084 | Battery | 167.0 MW | withdrawn | Lawrence, Missouri |
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-08-12 | Asbury 161 kV Substation | status | operational | withdrawn |
| 2026-08-12 | Asbury 161 kV Substation | withdrawn_date | — | 2026-08-10 |
| 2026-08-12 | Asbury 161 kV Substation | operational_date | 2029-08-01 | — |
| 2026-08-12 | Asbury 161 kV Substation | proposed_online_date | — | 2029-10-31 |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through EMDE.