Empire District Electric Co — Interconnection Queue Projects
Empire District Electric Co is associated with 22 tracked interconnection projects representing 2,015 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 14 | 1,397 MW |
| Wind | 3 | 600 MW |
| Other | 4 | 16 MW |
| Solar | 1 | 2 MW |
Geographic footprint
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Neosho Ridge Wind Energy Center | 62481_NRW1 | Wind | 301.0 MW | operational | Neosho, Kansas |
| State Line Combined Cycle | 7296_2-3 | Gas | 206.5 MW | operational | Jasper, Missouri |
| State Line Combined Cycle | 7296_2-1 | Gas | 181.0 MW | operational | Jasper, Missouri |
| State Line Combined Cycle | 7296_2-2 | Gas | 180.0 MW | operational | Jasper, Missouri |
| North Fork Ridge Wind Energy Center | 62478_NFRW1 | Wind | 149.4 MW | operational | Barton, Missouri |
| Kings Point Wind Energy Center | 62475_KPW1 | Wind | 149.4 MW | operational | Lawrence, Missouri |
| Riverton | 1239_12 | Gas | 148.8 MW | operational | Cherokee, Kansas |
| Empire Energy Center | 6223_2 | Gas | 129.0 MW | operational | Jasper, Missouri |
| Empire Energy Center | 6223_1 | Gas | 129.0 MW | operational | Jasper, Missouri |
| State Line Combined Cycle | 7296_1 | Gas | 123.0 MW | operational | Jasper, Missouri |
| Riverton | 1239_12-2 | Gas | 118.8 MW | operational | Cherokee, Kansas |
| Empire Energy Center | 6223_4 | Gas | 60.5 MW | operational | Jasper, Missouri |
| Empire Energy Center | 6223_3 | Gas | 60.5 MW | operational | Jasper, Missouri |
| Riverton | 1239_10 | Gas | 16.3 MW | operational | Cherokee, Kansas |
| Riverton | 1239_11 | Gas | 16.3 MW | suspended | Cherokee, Kansas |
| Riverton | 1239_13 | Gas | 13.5 MW | active | Cherokee, Kansas |
| Riverton | 1239_14 | Gas | 13.5 MW | active | Cherokee, Kansas |
| Ozark Beach | 6280_6 | Other | 4.0 MW | operational | Taney, Missouri |
| Ozark Beach | 6280_7 | Other | 4.0 MW | operational | Taney, Missouri |
| Ozark Beach | 6280_5 | Other | 4.0 MW | operational | Taney, Missouri |
| Ozark Beach | 6280_8 | Other | 4.0 MW | operational | Taney, Missouri |
| Prosperity Solar Farm CSG | 64225_PROS1 | Solar | 2.3 MW | operational | Jasper, Missouri |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through Empire District Electric Co.