Prosperity Solar Farm CSG (64225_PROS1)

Prosperity Solar Farm CSG is a 2.3 MW solar interconnection project in Jasper, Missouri with a current status of operational.

2.3 MWCapacity
OperationalStatus
SWPPMarket
SolarTechnology

Project facts

Canonical nameProsperity Solar Farm CSG
Queue ID64225_PROS1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologySolar
Capacity2.3 MW
StateMissouri
CountyJasper
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2021-03-01
Withdrawn date
Developer
Utility / transmission ownerEmpire District Electric Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata