ESTX-PLD-HOUSTON2 — Interconnection Queue Projects
ESTX-PLD-HOUSTON2 is associated with 2 tracked interconnection projects representing 409 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 6 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
2Projects
0Active
2Operational
0Withdrawn
409 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Battery | 2 | 409 MW |
Geographic footprint
| State | Projects |
|---|---|
| Texas | 2 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| SAHARA BESS (SOHO BESS) | 69200_SOHO1 | Battery | 204.4 MW | operational | Brazoria, Texas |
| SAHARA BESS (SOHO BESS) | 69200_SOHO2 | Battery | 204.3 MW | operational | Brazoria, Texas |
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-09-02 | SAHARA BESS (SOHO BESS) | operational_date | — | 2026-07-01 |
| 2026-09-02 | SAHARA BESS (SOHO BESS) | proposed_online_date | 2026-07-01 | — |
| 2026-09-02 | SAHARA BESS (SOHO BESS) | status | active | operational |
| 2026-09-02 | SAHARA BESS (SOHO BESS) | operational_date | — | 2026-07-01 |
| 2026-09-02 | SAHARA BESS (SOHO BESS) | proposed_online_date | 2026-07-01 | — |
| 2026-09-02 | SAHARA BESS (SOHO BESS) | status | active | operational |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-10-11
Page data generated2026-10-11
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through ESTX-PLD-HOUSTON2.
Start tracking with interXdata