FPL Energy Oliver County Wind II LLC — Interconnection Queue Projects

FPL Energy Oliver County Wind II LLC is associated with 2 tracked interconnection projects representing 99 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

2Projects
0Active
2Operational
0Withdrawn
99 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Wind299 MW

Portfolio by market

MarketProjects
MISO2

Geographic footprint

StateProjects
North Dakota2

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
FPL Energy Oliver Wind I LLC56392_1Wind50.6 MWoperationalOliver, North Dakota
FPL Energy Oliver Wind II LLC56573_2Wind48.0 MWoperationalOliver, North Dakota

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through FPL Energy Oliver County Wind II LLC.

Start tracking with interXdata