FPL Energy Oliver Wind II LLC (56573_2)

FPL Energy Oliver Wind II LLC is a 48.0 MW wind interconnection project in Oliver, North Dakota with a current status of operational.

48.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameFPL Energy Oliver Wind II LLC
Queue ID56573_2
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity48.0 MW
StateNorth Dakota
CountyOliver
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2007-12-01
Withdrawn date
Developer
Utility / transmission ownerFPL Energy Oliver County Wind II LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.